In rufiyaa
2020
2021
2022
2023
2024
Actual
Revised
Budgeted
Budgeted
Budgeted
Total
2,062,110,266
1,735,433,631
1,789,574,439
2,347,889,566
2,540,573,020
AA.Ukulhas Artificial Intelligence Conference Centre
AA. Ukulhas
4,760
-
-
-
-
Developing Airpoirt - Faresmaathoda
Ongoing GDh. Faresmaathodaa
13,030
26,839,582
12,118,481
13,213,410
20,360,646
Coastal Protection-Gn.Fuvamulah-OREO Prj
Ongoing Fuvahmulah City
1,137
-
-
-
-
Const. Of Covid Quarantine Facility - S.Hithadhoo
S. Hithadhoo
2,327,921
-
-
-
-
Const. Of Covid Quarantine Facility - Fuvamulak
Fuvahmulah City
289,984
-
-
-
-
Const. Of Covid Regional Centre - L.Gan
L. Gan
2,413,327
127,017
-
-
-
Const. Of Covid Health Facility - GA.Villingili
GA. Villingili
5,559,926
-
-
-
-
Const. Of Covid Regional Centre - B.Eydhafushi
B. Eydhafushi
13,076,230
-
-
-
-
Const. Of Covid Health Facility - Sh.Funadhoo
Sh. Funadhoo
12,421,873
-
-
-
-
Const. Of Covid Health Facility - HA.Ihavandhoo
HA. Ihavandhoo
528,900
-
-
-
-
Estab. Drainage System - HA.Dhihdhoo
Pre-Tendering HA. Dhidhdhoo
99,218
-
1,200,000
2,268,719
2,256,666
Upgrading of Harbour - R. Rasgetheemu
Ongoing R. Rasgetheemu
19,884,467
14,892,360
1,977,297
1,708,677
-
V. Keyodhoo Harbor (Phase 2)
V. Keyodhoo
7,384,040
714,775
-
-
-
Habour Construction - HA.Molhadhoo
Retention HA. Molhadhoo
8,341,360
11,871,840
1,699,461
-
-
Upgrading of Habour - HDh.Nellaidhoo
Retention HDh. Nellaidhoo
11,160,943
19,948,441
2,160,000
-
-
Reconstruction of Habour - Sh.Feevah
Ongoing Sh. Feevah
29,471,834
19,668,091
666,636
-
-
Upgr.Habour&Shore Protection-Sh.Lhaimagu
Ongoing Sh. Lhaimagu
7,971,164
5,253,924
1,093,383
962,565
-
Upgrading of Habour - Sh.Noomaraa
Sh. Noomaraa
5,042,471
4,244,875
-
-
-
Upgrading of Habour - Sh.Bileffahi
Ongoing Sh. Bileffahi
4,264,056
2,703,457
937,193
436,816
-
Upgrading of Habour - Sh.Feydhoo
Ongoing Sh. Feydhoo
4,971,745
4,279,444
646,228
569,955
-
Upgrading of Habour - Sh.Komandoo
Retention Sh. Komandoo
16,341,198
5,039,557
1,469,876
-
-
Upgrading of Habour - N.Miladhoo
Ongoing N. Miladhoo
9,395,841
3,332,519
1,031,933
6,709,295
2,611,767
Upgrading of Habour- N.Landhoo
Ongoing N. Landhoo
8,058,859
1,469,501
2,057,312
5,358,392
2,939,865
Habour Construction - R.Maduvvari
Retention R. Maduvvari
8,850,249
38,426,586
3,470,000
-
-
Upgrading of Habour - R.Rasmadhoo
Ongoing R. Rasmaadhoo
1,731,335
16,569,323
466,961
417,614
-
Habour Construction - ADh.Mandhoo
Ongoing ADh. Mandhoo
34,000
2,144,837
5,945,745
8,421,198
1,062,046
Construction of T-Jetty - V.Rakeedhoo
Retention V. Rakeedhoo
9,165,919
10,452,760
1,063,747
-
-
Habour Construction - Dh.Rinbudhoo
Retention Dh. Rinbudhoo
15,925,909
5,883,871
1,671,569
-
-
Upgrading of Habour - Dh.Hulhudheli
Ongoing Dh. Hulhudheli
2,773,288
12,048,867
6,156,149
4,257,546
1,099,629
Reconstruction of Habour - Th.Guraidhoo
Retention Th. Guraidhoo
387,192
21,956,396
2,293,835
-
-
Habour Construction - Th.Omadhoo
Retention Th. Omadhoo
21,242,312
9,412,128
1,832,020
-
-
Upgrading of Habour - L.Isdhoo
Retention L. Isdhoo
1,429,998
31,724,685
1,773,700
-
-
Harbour Entrance Channel - L.Maabaidhoo
L. Maabaidhoo
18,850,158
471,827
-
-
-
Breakwater project - GA.Maamendhoo
Retention GA. Maamendhoo
9,167,607
14,945,271
1,603,107
-
-
Upgr. Habour and Revetment - S.Meedhoo
Retention S. Meedhoo
15,332,399
8,505,843
1,810,912
-
-
Habour Construction - S.Maradhoofeydhoo
Retention S. Maradhoofeydhoo
23,064,266
4,976,468
2,049,599
-
-
V. Felidhoo Harbour
Retention V. Felidhoo
14,286,424
2,510,918
955,163
-
-
R. Angolhitheem Harbor Upgrading
Ongoing R. Angolhitheemu
2,240,776
13,936,798
4,996,324
2,052,567
-
Sh. Foakaidhoo Harbor Upgrading
Ongoing Sh. Foakaidhoo
7,919,241
6,898,470
3,306,961
11,128,066
1,476,747
Completion of Breakwater - Th. Madifushi
Retention Th. Madifushi
482,471
123,719
317,129
-
-
Harbor Project Ph 2 - GA. Villingili
Retention GA. Villingili
10,133,571
696,112
575,353
-
-
Harbor Upgrading - HA. Ihavandhoo
Retention HA. Ihavandhoo
3,711,863
19,908,813
2,868,054
-
-
Harbor Project (Phase II)- HA. Kelaa
HA. Kelaa
12,477,374
1,462,685
-
-
-
Harbor Upgrading - HDh. Hanimaadhoo
Ongoing HDh. Hanimaadhoo
6,422,290
11,703,850
6,525,707
991,240
1,457,051
Harbor Construction - ADh. Dhidhdhoo
Retention ADh. Dhidhdhoo
13,366,372
4,500,234
1,258,351
-
-
Harbor Upgrading - F.Dharanboodhoo
Ongoing F. Dharanboodhoo
4,443,467
17,435,945
5,679,233
-
-
Construction of Breakwater - L. Maavah
Retention L. Maavah
19,121,707
6,888,684
1,369,940
-
-
Dev. of Quay Wall - GA. Kanduhulhudhoo
GA. Kanduhulhudhoo
9,217,735
1,529,322
-
-
-
Ice Plant Jetty Construction - GDh. Thinadhoo
Retention GDh. Thinadhoo
16,791,216
446,962
974,135
-
-
Developing Harbour - AA.Himandhoo
AA. Himandhoo
20,695,381
1,070,491
-
-
-
Upgrading Harbour - M.Dhiggaru
Pre-Tendering M. Dhiggaru
87,500
1,693,489
200,000
1,661,273
17,224,742
Developing Harbour - S.Hulhudhoo
Ongoing S. Hulhudhoo
10,959,038
25,252,137
1,924,157
-
-
Reconstruction of Breakwater - S.Maradhoo
S. Maradhoo
22,335,687
998,228
-
-
-
Const.of 100 Housing units-B.Thulhaadhoo
Ongoing B. Thulhaadhoo
7,757,282
4,963,523
6,817,858
1,349,849
2,029,710
Const.of 150 Housing Units -M.Kolhufushi
Ongoing M. Kolhufushi
1,874,213
12,302,845
8,564,822
4,671,653
1,886,798
Fuvahmulah Flat area Landscape and fence
Retention Fuvahmulah City
4,140,641
2,218,481
958,893
-
-
Contst.of 100 Housing Units-Thimarafushi
Ongoing Th. Thimarafushi
4,346,657
9,169,536
5,890,016
5,611,552
1,780,675
Development of 1500 Housing Units - Ph2
Ongoing Multiple Islands
2,001,514
7,997,447
3,614,471
-
-
Const.of 396 Housing Units in HDH and HA
HDh. Nolhivaranfaru
25,054,762
-
-
-
-
Provision of utilities for 50 housing units
L. Fonadhoo
142,427
3,112,908
-
-
-
Estab. Water & Sewerage System - N.Maafaru
Ongoing N. Maafaru
367,465
402,607
8,144,559
8,112,393
2,866,991
Developing Harbour - GDh.Faresmaathoda
Pre-Tendering GDh. Faresmaathodaa
368,864
-
200,000
2,267,156
18,730,168
Developing Harbour - L.Dhanbidhoo
L. Dhanbidhoo
914,527
-
-
-
-
Developing Harbour - F.Nilandhoo
F. Nilandhoo
1,674,814
-
-
-
-
Developing Harbour - Th.Madifushi
Th. Madifushi
36,800
1,153,011
-
-
-
Harbor Construction Project - GDh.Madaveli
GDh. Madaveli
1,364,633
-
-
-
-
Upgrading of Harbor - Sh.Maaugoodhoo
Sh. Maaungoodhoo
557,909
-
-
-
-
Harbor Construction Project - L.Hithadhoo
L. Hithadhoo
1,345,351
-
-
-
-
Completion of Breakwater - AA.Rasdhoo
New AA. Rasdhoo
286,395
-
2,250,000
4,253,848
4,231,248
Developing Entrance Channel - K.Kaashidhoo
Retention K. Kaashidhoo
2,721,397
423,192
800,000
-
-
Developing Harbour Key Wall - L.Fonadhoo
L. Fonadhoo
333,943
-
-
-
-
Developing Harbour - Adh.Mahibadhoo
ADh. Mahibadhoo
803,928
-
-
-
-
Reconstruction of Harbour - M.Veyvah
Retention M. Veyvah
15,052,165
23,580,735
2,436,296
-
-
Developing Harbour - N.Henbadhoo
Retention N. Henbadhoo
20,280,087
2,668,415
1,530,904
-
-
Developing Harbour - B.Fulhadhoo
Ongoing B. Fulhadhoo
8,034,092
18,424,232
1,394,053
-
-
Developing Harbour - B.Fehendhoo
Ongoing B. Fehendhoo
9,161,701
14,786,587
1,449,815
-
-
Developing Roads - HDh.Hanimaadhoo
Ongoing HDh. Hanimaadhoo
11,715,753
20,818,157
6,412,708
1,311,799
1,928,250
Upgrading Roads - Male
Ongoing Male' City
7,725,335
10,025,625
8,585,640
5,216,557
1,268,980
Const. of 100 Housing Units in Lh.Naifaru (Equity Comp)
Ongoing Lh. Naifaru
12,774,365
21,600,733
3,055,786
1,224,353
-
Construction of a Housing Unit in Lh.Olhuvelifushi
Lh. Olhuvelifushi
319,543
268,306
-
-
-
Male - Hulhule Bridge Project
Male' City
8,480
-
-
-
-
Male Industrial Village - South West Harbour
Male' City
6,845,889
143,736
-
-
-
Construction of King Salman Mosque
Retention Male' City
17,638,765
8,574,454
846,758
-
-
Greater Male Connectivity Project (Male - Thilafushi Bridge)
Ongoing Male' City
305,424,966
115,191,224
13,940,524
27,877,458
47,428,557
Developing Harbour - GA.Villingili
GA. Villingili
17,814,385
337,794
-
-
-
Harbour Expansion Project - Kulhudhuffushi
HDh. Kulhudhuffushi
3,833,562
4,616,627
-
-
-
Developing Jetty - V.Fulidhoo
V. Fulidhoo
1,668,924
-
-
-
-
Developing Roads - R.Ungoofaaru
Retention R. Ungoofaaru
2,657,196
12,926,167
1,519,395
-
-
Harbor Construction Project - K.Viligili
Villimale'
249,361
-
-
-
-
Land Reclamation and Revetment Work - K.Hinnmafushi
K. Himmafushi
4,752,163
-
-
-
-
Storm Water Development and Maintenance (Male) Phase 4
Ongoing Male' City
1,330,444
591,215
334,573
-
-
Male Re-development Project
Male' City
16,675
20,776
-
-
-
Developing Roads - R.Dhuvaafaru
Ongoing R. Dhuvaafaru
16,726,729
22,843,294
4,072,345
1,120,147
-
Developing Regional Hospital - S.Hithadhoo
S. Hithadhoo
30,192,488
731,600
-
-
-
Land Reclamation - K.Gulhifalhu
Ongoing K. Gulhifalhu
651,881,783
4,441,276
1,875,908
955,880
1,745,586
Estab. Water System - Th.Madifushi
Tendering Th. Madifushi
182,917
205,782
6,802,533
7,161,289
15,528,551
Estab. Water System - HDh.Naivaadhoo
Ongoing HDh. Naivaadhoo
-
2,718,032
392,788
-
-
Construction of GDh.Thinadhoo Islamic Centre
GDh. Thinadhoo
66,807
-
-
-
-
Contruction of MNPI Office Building
Ongoing Hulhumale'
20,903,236
54,356,122
10,360,963
3,147,613
-
Renovating Min. Of Foreign Affaris
Retention Male' City
2,565,116
128,622
36,000
-
-
Maldives Urband Dev. & Reslience Project
Ongoing Multiple Islands
746,480
-
3,738,048
3,158,887
42,495,496
K.Huraa Land Reclamation&revetment (Ph2)
Retention K. Huraa
13,687,828
797,454
1,812,940
-
-
Land Reclamation - K.Guraidhoo
Retention K. Guraidhoo
41,336,639
19,543,840
4,924,498
-
-
Land Reclamation - K.Maafushi
Retention K. Maafushi
67,920,626
28,637,370
6,448,368
-
-
Road Construction - B.Eydhafushi
Retention B. Eydhafushi
14,458,949
9,640,969
1,957,905
-
-
Road Construction - Th.Guraidhoo
Pre-Tendering Th. Guraidhoo
2,998
-
57,330
108,389
107,813
Road Construction - Th.Thimarafushi
Ongoing Th. Thimarafushi
11,355,634
7,699,441
7,645,690
10,743,949
1,885,109
Road Construction - GDh.Gaddhoo
Ongoing GDh. Gaddhoo
20,813,213
22,019,959
11,604,495
20,967,177
3,454,714
Road Construction - Fuvahmulah City
Ongoing Fuvahmulah City
11,358,966
65,700,010
27,881,047
34,532,717
8,460,099
Road Construction - L. Fonadhoo
Retention L. Fonadhoo
5,335,555
18,578,170
2,200,786
-
-
Addu City Road Development
Awarded Addu City
40,745
46,565
9,000,000
10,750,648
12,317,837
Developing Roads in 4 Islands - Addu City
Ongoing Addu City
28,129,504
16,640,414
11,242,024
11,170,500
3,346,805
Developing Roads - S.Hulhudhoo & Meedhoo
Retention Addu City
21,506,274
8,096,556
2,254,588
-
-
Developing Roads - Sh.Milandhoo
Ongoing Sh. Milandhoo
23,471,645
9,282,841
10,470,624
18,032,111
15,585,779
Developing Roads - Adh.Maamigili
Ongoing ADh. Maamingili
14,256,497
9,492,735
10,599,628
15,023,483
4,733,341
Estab. Sewerage System - Sh.Foakaidhoo
Ongoing Sh. Foakaidhoo
1,928,341
3,740,028
2,843,798
1,520,425
423,306
Estab. Sewerage System for New Settlement - GA.Villingili
Ongoing GA. Villingili
169,600
2,429,964
10,017,885
4,480,579
-
Estab. Sewerage System - Dh.Hulhudheli
Dh. Hulhudheli
1,118,868
-
-
-
-
Development of Artificial Beach
Male' City
207,495
-
-
-
-
Developing National Transport Network
Multiple Islands
21,890
-
-
-
-
Water and Sewerage System -HDh.Kumundhoo
Ongoing HDh. Kumundhoo
254,976
352,510
8,673,796
16,839,968
12,720,664
Water and Sewerage System - Sh.Goidhoo
Ongoing Sh. Goidhoo
1,131,194
366,314
4,611,976
16,653,185
12,357,070
Water and Sewerage Systm-Kendhikulhudhoo
Ongoing N. Kendhikulhudhoo
2,371,893
13,127,648
5,280,327
8,906,625
4,421,191
Water and Sewerage System - R.Fainu
Ongoing R. Fainu
232,803
6,371,600
6,775,060
1,038,250
7,440,265
Water and Sewerage System - R.Kinolhas
Ongoing R. Kinolhas
6,567,907
14,734,974
5,730,627
610,664
-
Water and Sewerage System - B.Kamadhoo
Ongoing B. Kamadhoo
271,605
320,323
7,665,210
4,642,913
6,655,418
Water and Sewerage System -Olhuvelifushi
Ongoing Lh. Olhuvelifushi
232,803
334,790
10,745,272
6,514,330
9,406,266
Water and Sewerage System - AA.Feridhoo
Ongoing AA. Feridhoo
210,632
236,961
-
-
-
Water and Sewerage System -Th.Kinbidhoo
Ongoing Th. Kinbidhoo
9,858,331
6,386,526
3,753,629
2,165,560
-
Water and Sewerage System - Th.Vandhoo
Ongoing Th. Vandhoo
2,530,938
2,791,801
2,463,798
2,183,706
356,654
Water and Sewerage System -Th.Thakandhoo
Ongoing Th. Kandoodhoo
4,841,874
1,608,469
3,017,247
840,746
-
Water and Sewerage System -L.Kunahandhoo
Tendering L. Kunahandhoo
232,803
261,904
5,736,626
4,067,123
8,570,852
Water and Sewerage System - L.Hithadhoo
Tendering L. Hithadhoo
238,347
268,140
7,154,567
5,072,407
10,689,340
Water and Sewerage System -GA.Dhevvadhoo
Awarded GA. Dhevvadhoo
227,261
255,669
5,705,235
8,229,056
8,670,752
Water and Sewerage Network - HA.Uligamu
Ongoing HA. Uligamu
13,806,009
5,078,253
2,280,205
611,685
-
Fuvamulak Water & Sewerage system
Fuvahmulah City
4,848,888
-
-
-
-
N. Landhoo Sewerage Sytem
Retention N. Landhoo
8,287,603
1,295,633
649,331
-
-
B. Goidhoo Water & Sewerage System
Ongoing B. Goidhoo
7,886,040
10,732,429
11,619,209
5,186,280
1,153,032
Provision of Water Supply & Sewerage Project
Ongoing Multiple Islands
549,038
2,399,660
16,500,000
10,173,788
315,228,601
Water & Sewerage System - F. Magoodhoo
Ongoing F. Magoodhoo
4,989,045
8,329,085
-
-
-
Establishing Water & Sewerage System - HA.Vashafaru
Ongoing HA. Vashafaru
216,175
302,922
7,233,955
1,354,213
9,825,976
Establishing Water & Sewerage System - M.Raiymandhoo
Tendering M. Raiymandhoo
238,347
268,140
3,109,292
2,204,410
12,705,013
Estab. Water & Sewerage System - HA.Filladhoo
Ongoing HA. Filladhoo
343,523
13,941,160
816,056
464,147
-
Water Supply System - HDh.Nolhivaram
Ongoing HDh. Nolhivaram
5,445,342
3,687,278
2,919,285
428,074
629,238
Water Supply System - R.AliFushi
Ongoing R. Alifushi
1,688,765
3,737,562
2,107,086
3,969,854
823,985
HA. Dhihdhoo Water Supply System
HA. Dhidhdhoo
2,479,387
-
-
-
-
L. Fonadhoo Water Supply System
L. Fonadhoo
2,213,519
192,932
-
-
-
Th. Thimarafushi Water Supply System
Th. Thimarafushi
12,228
-
-
-
-
Adh. Dhangethi Water Supply System
Ongoing ADh. Dhangethi
2,494
-
-
-
-
A.Dh Fenfushi Water Supply System
Pre-Tendering ADh. Fenfushi
155,203
174,603
5,200,000
14,684,780
15,907,046
Estab. Water System - L.Maavah
Ongoing L. Maavah
4,290,068
5,198,480
-
-
-
Development of Airport - M. Muli
Ongoing M. Muli
-
3,677,115
1,366,385
11,072,160
1,017,205
Extension of Airport - N.Maafaru
Tendering N. Maafaru
-
-
3,000,000
6,868,355
6,827,777
Dev. Of Domestic Airports on Multiple Islands
Pre-Tendering Multiple Islands
-
6,949
20,000,000
40,067,257
37,351,454
Dev. Of Airport - HDh.Kulhudhuffushi
HDh. Kulhudhuffushi
-
3,005,092
-
-
-
Coastal Protection - B.Dhonfanu
Ongoing B. Dhonfanu
-
25,462
-
-
-
Est. Of Covid Emergency Facility - GDh.Thinadhoo
GDh. Thinadhoo
-
3,488,727
-
-
-
Estab. Water & Sewerage System - L.Mundoo
Ongoing L. Mundoo
-
6,237,628
4,953,884
5,940,443
884,877
Estab. Water & Sewerage System - GA.Kondey
Ongoing GA. Kondey
-
8,478,127
5,013,390
4,264,526
895,506
Estab. Water & Sewerage System - GDh.Rathafandhoo
Ongoing GDh. Rathafandhoo
-
6,498,449
4,227,249
5,422,259
838,982
Upgrading of Habour - Dh.Meedhoo
Ongoing Dh. Meedhoo
-
3,989,452
6,217,641
6,388,644
991,619
Harbor Project Ph 3 - GA. Villingili
Ongoing GA. Villingili
-
11,088,969
6,118,363
929,365
-
Jetty Construction - HA. Dhidhdhoo
Ongoing HA. Dhidhdhoo
-
85,748
6,730,813
1,158,715
-
Harbor Project (Phase II)- K. Himmafushi
Ongoing K. Himmafushi
-
2,402,193
5,796,470
6,321,138
-
Harbor Upgrading - ADh. Hangnaameedhoo
Ongoing ADh. Hangnaameedhoo
-
3,459,352
5,575,757
7,503,057
995,958
Expansion of Harbour entrance channel - S. Hulhumeedhoo
Retention S. Hulhudhoo
-
20,729,990
3,735,000
-
-
Developing Harbour (2nd Phase) - GDh.Gahdhoo
GDh. Gaddhoo
-
733,305
-
-
-
Developing Harbour - HA.Baarah
Ongoing HA. Baarah
-
2,572,433
1,282,528
232,082
341,143
Expan. of Harbour & Const. of Entrance Channel - HA.Uligamu
Ongoing M. Mulah
-
1,612,701
6,059,769
15,498,503
-
Developing Harbour - HA.Muraidhoo
Ongoing HA. Muraidhoo
-
5,890,627
5,195,715
894,447
-
Developing Harbour - HA.Dhihdhoo
Ongoing HA. Dhidhdhoo
-
5,115,499
6,730,813
1,158,715
1,703,226
Upgrading Entrance Channel - HA.Thakandhoo
Pre-Tendering HA. Thakandhoo
-
6,506
2,212,500
4,182,175
4,160,023
Upgrading Harbour - Sh.Maroshi
Ongoing Sh. Maroshi
-
496,649
3,676,117
9,286,353
4,377,590
Developing Entrance Channel - N.Manadhoo
Ongoing N. Manadhoo
-
433,821
2,155,204
9,216,403
3,272,236
Developing Breakwater & Quay Wall - B.Hithaadhoo
Ongoing B. Hithaadhoo
-
541,225
3,389,709
5,750,971
605,480
Upgrading Harbour - Lh.Hinnavaru
Ongoing Lh. Hinnavaru
-
8,131,888
11,609,668
13,359,814
26,743,641
Devel. Breakwater at Ferry Terminal - AA.Ukulhas
Retention AA. Ukulhas
-
5,282,232
1,262,500
-
-
Reconstruction of Harbour - AA.Thoddoo
Ongoing AA. Thoddoo
-
9,770,920
8,224,659
10,265,378
1,469,112
Upgrading Harbour - Adh.Fenfushi
Ongoing ADh. Fenfushi
-
6,137,301
4,472,120
8,666,642
998,529
Upgrading Harbour - V.Thinadhoo
Pre-Tendering V. Thinadhoo
-
1,446,769
5,992,770
10,423,328
10,447,555
Reconstruction of Harbour - M.Muli
Ongoing M. Muli
-
1,823,990
3,919,484
12,090,418
1,166,849
Reconstruction of Harbour - Th.Kandoodhoo
Ongoing Th. Kandoodhoo
-
7,612,905
4,590,495
7,768,520
-
Developing Quay Wall - S.Hithadhoo
Ongoing S. Hithadhoo
-
10,796,007
6,157,821
935,359
-
Port Development Project - K.Gulhifalhu
Pre-Tendering K. Gulhifalhu
-
2,717,762
1,000,000
5,000,000
5,000,000
Upgrading Harbour - L.Gan
Ongoing L. Gan
-
78,705
4,264,261
13,818,273
1,269,491
Developing Breakwater - M.Maduvvari
Pre-Tendering M. Maduvvari
-
74,624
6,601,650
12,454,622
12,390,774
Development Of Slipway - N.Velidhoo
Ongoing N. Velidhoo
-
428,739
1,770,332
5,756,474
-
Development Of Slipway - V.Rakeedhoo
V. Rakeedhoo
-
428,739
-
-
-
Const. of Cancer Hospital - L.Gan
Pre-Tendering L. Gan
-
1,486,241
7,737,396
12,856,637
13,546,719
Affordable Housing Scheme Project
Ongoing Multiple Islands
-
6,453,498
-
-
-
Devel. Of 60 Housing Units - HDh.Nolhivaranfaru
Retention HDh. Nolhivaranfaru
-
14,331,477
1,911,883
-
-
Completion Of 56 Housing Units - Th.Vilufushi
Ongoing Th. Vilufushi
-
12,320,440
7,868,846
17,069,215
234,259
Completion Of Housing Units - HDh.Nolhivaranfaru
Ongoing HDh. Nolhivaranfaru
-
21,740,367
9,914,785
1,506,034
221,376
Finishing Of 100 Housing units - HDh.Hanimaadhoo
Awarded HDh. Hanimaadhoo
-
11,908,980
13,540,045
9,026,696
13,486,409
Finishing Of 105 Housing units - HDh.Kulhudhufushi
Ongoing HDh. Kulhudhuffushi
-
16,214,142
7,949,519
966,011
1,419,966
Repair Of 40 Housing units - HDh.Kulhudhufushi
HDh. Kulhudhuffushi
-
22,727,895
-
-
-
Installing street lights in 250 housing units - HA.Dhihdhoo
HA. Dhidhdhoo
-
6,855,202
-
-
-
Reclaimation of land in G.A Dhaandhoo
GA. Dhaandhoo
-
70,204
-
-
-
Land Reclamation - M.Dhiggaru
Ongoing M. Dhiggaru
-
300,117
5,576,209
22,457,443
16,932,659
Construction of Sea Wall and Quay Wall - GA.Kanduhulhudhoo
GA. Kanduhulhudhoo
-
566,153
-
-
-
Upgrading Harbour - R.Kinolhas
Ongoing R. Kinolhas
-
1,634,752
4,583,033
731,552
1,075,328
Harbor Construction Project - ADh.Dhagethi
ADh. Dhangethi
-
1,319,032
-
-
-
Upgrading Harbour - AA.Maalhos
Ongoing AA. Maalhos
-
5,752,902
8,364,314
7,476,378
18,725,529
Developing Quay Wall - R.Maakurath
R. Maakurathu
-
1,600,863
-
-
-
Reconstruction of Harbour - S.Maradhoo
S. Maradhoo
-
342,991
-
-
-
Developing Breakwater - M.Naalaafushi
M. Naalaafushi
-
355,260
-
-
-
Th.Guraidhoo Land Reclamation
Th. Guraidhoo
-
6,287,485
-
-
-
Developing Jetty - M.Raiymandhoo
Pre-Tendering M. Raiymandhoo
-
74,624
7,032,713
13,269,588
13,201,411
Developing Roads - GDh.Thinadhoo
Awarded GDh. Thinadhoo
-
16,936,886
11,820,131
10,362,272
11,773,308
Dev. Roads Ph 2 - Addu City
Pre-Tendering Addu City
-
357,602
200,000
2,481,412
10,458,407
Museum Park - GDh.Thinadhoo
GDh. Thinadhoo
-
1,332,458
-
-
-
Developing Breakwater - F.Bileidhoo
F. Bilehdhoo
-
300,117
-
-
-
Land Reclamation - HA.Dhihdhoo
HA. Dhidhdhoo
-
150,059
-
-
-
Land Reclamation - GA.Kolamaafushi
Ongoing GA. Kolamaafushi
-
428,739
3,430,373
9,804,608
2,450,973
Land Reclamation - R.Ungoofaaru
Ongoing R. Ungoofaaru
-
4,845,520
1,924,955
1,276,370
1,876,172
Land Reclamation - HA.Ihavandhoo
Ongoing HA. Ihavandhoo
-
3,472,417
3,456,158
2,105,012
4,482,174
Land Reclamation - HA.Thuraakunu
Ongoing HA. Thuraakunu
-
128,622
1,640,061
1,282,658
1,885,414
Land Reclamation - R.Dhuvaafaru
Ongoing R. Dhuvaafaru
-
51,418,432
3,868,042
2,424,352
5,976,233
Land Reclamation - K.Gulhi
Ongoing K. Gulhi
-
128,622
2,788,104
17,682,084
1,962,878
Land Reclamation - AA.Ukulhas
Ongoing AA. Ukulhas
-
4,601,492
1,994,912
18,181,352
1,781,685
Land Reclamation - AA.Bodufulhadhoo
Ongoing AA. Bodufulhadhoo
-
128,622
2,198,934
17,960,469
1,963,899
Land Reclamation - F.Feeali
Ongoing F. Feeali
-
128,622
4,082,220
19,740,916
1,822,945
Land Reclamation - F.Magoodhoo
Ongoing F. Magoodhoo
-
128,622
2,788,104
17,036,078
1,896,241
Land Reclamation - Th.Hirilandhoo
Awarded Th. Hirilandhoo
-
129,764
2,941,297
24,049,694
2,626,916
Land Reclamation - L.Maavah
Ongoing L. Maavah
-
215,512
5,592,938
21,544,212
2,497,567
Land Reclamation - GA.Dhaandhoo
Ongoing GA. Dhaandhoo
-
128,622
10,424,505
15,834,586
46,551,389
Land Reclamation & Causeway Upgrade - GDh.Madaveli
Ongoing GDh. Madaveli
-
8,574,777
8,364,314
26,680,925
3,735,145
R.Alifushi Land Reclamation
Ongoing R. Alifushi
-
5,164,159
4,431,462
14,991,432
7,998,191
Addu City Reclamation and Shore Protection
Ongoing Addu City
-
6,902,044
6,691,451
4,388,479
3,225,373
Land Reclamation - Lh.Felivaru
Lh.Felivaru
-
1,459,696
-
-
-
Comm. Rehab. & Detox Centre-S.Hulhudhoo
Ongoing S. Hulhudhoo
-
6,497,982
-
-
-
Road Construction - R.Hulhuduffaaru
Ongoing R. Hulhudhuffaaru
-
17,148,811
4,906,729
18,105,433
2,213,996
Road Construction - L.Gan
Pre-Tendering L. Gan
-
569,529
200,000
3,722,117
10,458,407
Estb.Causeway -L.Kalaidhoo/L.Dhanbidhoo
Pre-Tendering L. Kalaidhoo
-
156,393
1,095,000
1,983,840
1,980,883
Estab.Causeway - L.Hithadhoo/L.Mendhoo
Pre-Tendering L. Hithadhoo
-
156,393
1,095,000
1,983,840
1,980,883
Road Construction - M.Mulah
Awarded M. Mulah
-
15,934,608
10,623,072
8,862,184
15,871,488
Developing Roads (Phase 2) - Kulhudhuffushi
Awarded HDh. Kulhudhuffushi
-
15,105,007
22,605,007
13,862,231
22,515,464
Developing Roads - Lh.Hinnavaru
Awarded Lh. Hinnavaru
-
18,307,306
12,204,870
18,307,306
18,234,786
Estab. Sewerage System - HDh.Naivaadhoo
Awarded HDh. Naivaadhoo
-
8,798,414
1,083,065
2,228,392
675,724
Upgrading Sewerage System - AA.Rasdhoo
Ongoing AA. Rasdhoo
-
2,126,709
198,291
-
-
Estab. Of High Speed Ferry System - North Region
Ongoing Multiple Islands
-
52,297,825
557,621
-
-
Estab. Water & Sewerage System - HA.Molhadhoo
Ongoing HA. Molhadhoo
-
6,892,565
3,999,704
6,392,123
1,786,097
Estab. Water & Sewerage System - Sh.Noomara
Ongoing Sh. Noomaraa
-
1,693,054
3,743,397
9,432,294
491,659
Estab. Water & Sewerage System - Sh.Bileifahi
Ongoing Sh. Bileffahi
-
1,089,004
4,249,099
13,338,855
632,489
Estab. Water & Sewerage System - AA.Bodufulhadhoo
Ongoing AA. Bodufulhadhoo
-
7,463,173
3,734,116
2,268,814
666,999
Estab. Water & Sewerage System - M.Veyvah
Ongoing M. Veyvah
-
9,107,718
4,556,945
2,768,758
666,999
Estab. Water & Sewerage System - Dh.Rinbudhoo
Ongoing Dh. Rinbudhoo
-
5,496,464
5,795,065
5,880,117
862,609
Estab. Water & Sewerage System - Th.Omadhoo
Ongoing Th. Omadhoo
-
9,047,137
3,259,177
3,616,743
666,999
Micro grid desalination Plant
Ongoing Multiple Islands
-
2,133,169
2,788,104
1,517,139
247,787
Estab. Water System - F.Feeali
Ongoing F. Feeali
-
7,092,901
3,548,854
2,156,252
666,999
Estab. Water System - HA.Utheemu
Ongoing HA. Utheemu
-
4,248,166
3,991,632
373,120
-
Estab. Water System - R.Rasmaadhoo
Ongoing R. Rasmaadhoo
-
6,962,855
2,652,166
423,343
666,999
Estab. Water System - R.Maakurath
Ongoing R. Maakurathu
-
5,184,889
2,001,209
6,398,008
1,565,162
Estab. Water System - Dh.Hulhudheli
Awarded Dh. Hulhudheli
-
3,225,604
3,051,182
3,612,563
5,134,917
Estab. Water System - Dh.Maaenboodhoo
Ongoing Dh. Maaenboodhoo
-
4,593,817
2,298,465
1,396,526
666,999
Estab. Water System - Th.Buruni
Ongoing Th. Buruni
-
7,440,713
2,680,472
2,893,977
666,999
Estab. Water System - Th.Veymandoo
Ongoing Th. Veymandoo
-
5,514,207
-
-
-
Estab. Water System - L.Dhanbidhoo
Awarded L. Dhanbidhoo
-
4,632,342
3,976,298
4,707,888
6,305,457
Upgrading of Airport - Hdh.Hanimaadhoo
Ongoing HDh. Hanimaadhoo
-
-
1,631,533
330,434
3,885,721
Upgrading of Airport - S.Gan
Pre-Tendering S. Gan
-
-
371,231
701,848
698,119
Coastal Protection - HA.Hoarafushi Airport
Ongoing HA. Hoarafushi
-
-
9,140,630
1,851,255
2,721,210
Bridge Const. Study GA.Villigili-Kooddoo
New GA. Villingili
-
-
450,000
903,943
819,768
Coastal Protection - AA.Thoddoo
New AA. Thoddoo
-
-
783,750
1,481,757
1,473,885
Coastal Protection - ADh.Dhangethi
New ADh. Dhangethi
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - B.Hithaadhoo
New B. Hithaadhoo
-
-
2,556,075
4,832,514
4,806,839
Coastal Protection - Dh.Bandidhoo
New Dh. Bandidhoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - DH. Rinbudhoo
New Dh. Rinbudhoo
-
-
200,000
277,829
2,364,183
Coastal Protection - L.Gan
New L. Gan
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - L.Maabaidhoo
New L. Maabaidhoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - L.Maamendhoo
New L. Maamendhoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - N.Holhudhoo
New N. Holhudhoo
-
-
1,141,890
2,158,857
2,147,387
Coastal Protection - R.Maakurathu
New R. Maakurathu
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection of Kulhudhufushi Airport
New HDh. Kulhudhuffushi
-
-
2,175,000
4,112,054
4,090,206
Estab. Drainage System - Kulhudhuffushi
Awarded HDh. Kulhudhuffushi
-
-
4,875,000
9,216,672
9,167,704
Estab. Drainage System - HDh.Vaikaradhoo
Pre-Tendering HDh. Vaikaradhoo
-
-
750,000
1,417,949
1,410,416
Estab. Drainage System - Dh.Kudahuvadhoo
Pre-Tendering Dh. Kudahuvadhoo
-
-
1,350,000
2,574,324
2,334,605
Estab. Drainage System - Th.Veymandoo
Pre-Tendering Th. Veymandoo
-
-
200,000
1,050,000
2,925,281
Development of slipway - HDh.Makunodhoo
Pre-Tendering HDh. Makunudhoo
-
-
200,000
787,500
2,115,537
Upgrading of Habour - Fuvahmulah City
Pre-Tendering Fuvahmulah City
-
-
7,914,513
14,963,172
14,883,674
Repairing Harbour - HDh. Naivaadhoo
Pre-Tendering HDh. Naivaadhoo
-
-
1,924,050
3,637,608
3,618,281
Harbor Upgrading - K. Huraa
Awarded K. Huraa
-
-
200,000
5,999,514
17,030,715
Expansion of Harbour - HA.Uligamu
Pre-Tendering HA. Uligamu
-
-
8,775,000
8,295,004
8,740,240
Developing Entrance Channel - HDh.Kumundhoo
Pre-Tendering HDh. Kumundhoo
-
-
1,833,075
3,465,610
3,447,198
Upgrading Harbour - N.Lhohi
Pre-Tendering N. Lhohi
-
-
6,278,000
11,759,782
12,686,677
Upgrading Entrance Channel - R.Ungoofaaru
Pre-Tendering R. Ungoofaaru
-
-
1,849,500
3,496,663
3,478,086
Extension of Harbour - R.Maakurath
Pre-Tendering R. Maakurathu
-
-
4,019,520
7,599,302
7,558,927
Reconstruction of Harbour - B.Kamadhoo
Pre-Tendering B. Kamadhoo
-
-
6,620,250
12,516,240
12,449,743
Developing Harbour - B.Eydhafushi
Pre-Tendering B. Eydhafushi
-
-
200,000
1,687,078
12,954,544
Developing Quay Wall - K.Kaashidhoo
Pre-Tendering K. Kaashidhoo
-
-
1,500,000
2,835,899
2,820,832
Extension of Harbour - GA.Dhaandhoo
Pre-Tendering GA. Dhaandhoo
-
-
6,431,525
12,159,436
12,094,834
Developing New Entrance Channel - GDh.Gadhdhoo
Pre-Tendering GDh. Gaddhoo
-
-
4,486,650
8,482,457
8,437,391
Developing Slipway - N.Kendhikulhudhoo
Pre-Tendering N. Kendhikulhudhoo
-
-
1,017,750
1,924,157
1,913,935
Developing Harbour - Sh.Maaungoodhoo
Pre-Tendering Sh. Maaungoodhoo
-
-
5,899,238
10,456,026
11,440,993
Devel. Of Breakwater and Harbour - R.Dhuvaafaru
Pre-Tendering R. Dhuvaafaru
-
-
200,000
2,336,308
17,191,728
Repairing Harbour - Sh.Narudhoo
Pre-Tendering Sh. Narudhoo
-
-
5,602,470
9,792,520
10,740,741
Upgrading Harbour -Th.Buruni
Pre-Tendering Th. Buruni
-
-
5,902,035
11,158,383
11,099,100
Upgrading Harbour - L.Maamendhoo
Pre-Tendering L. Maamendhoo
-
-
6,670,796
12,611,801
12,544,796
Jetty Construction - HDh.Kulhudhuffushi
Pre-Tendering HDh. Kulhudhuffushi
-
-
200,000
538,821
3,915,020
Devel. Of Ferry Terminal - Lh.Naifaru
New Lh. Naifaru
-
-
630,000
1,191,078
1,184,749
Devel. Of Breakwater - LH.Kurendhoo
New Lh. Kurendhoo
-
-
2,625,756
8,093,585
7,738,332
Habour Survey and Designing - GDh.Fiyoaree
New GDh. Fiyoaree
-
-
135,000
255,231
253,875
Harbor Construction - L.Kalaidhoo
New L. Kalaidhoo
-
-
6,054,001
11,445,690
11,384,881
High Speed Ferry Network Access Improvement Platform
New Multiple Islands
-
-
30,000,000
15,512,254
29,500,509
Repairing Harbour - B.Maalhos
New B. Maalhos
-
-
6,054,001
11,445,690
11,384,881
Upgrading Breakwater - GA.Gemanafushi
New GA. Gemanafushi
-
-
2,250,000
4,253,848
4,231,248
Upgrading Entrance Channel - B.Thulhaadhoo
New B. Thulhaadhoo
-
-
2,250,000
4,253,848
4,231,248
Upgrading Entrance Channel - N.Kendhikulhudhoo
New N. Kendhikulhudhoo
-
-
2,250,000
4,253,848
4,231,248
Upgrading Harbour - AA.Mathiveri
New AA. Mathiveri
-
-
1,500,000
1,000,000
-
Upgrading Harbour - AA.Ukulhas
New AA. Ukulhas
-
-
3,787,500
7,160,645
7,122,601
Upgrading Harbour - Adh.Dhigurah
New ADh. Dhigurah
-
-
6,054,001
11,445,690
11,384,881
Upgrading Harbour - Adh.Omadhoo
New ADh. Omadhoo
-
-
200,000
1,790,161
11,583,851
Upgrading Harbour - B.Dharavandhoo
New B. Dharavandhoo
-
-
4,200,000
7,940,517
7,898,330
Upgrading Harbour - K.Maafushi
New K. Maafushi
-
-
3,787,500
7,160,645
7,122,601
Upgrading Harbour - M.Naalaafushi
New M. Naalaafushi
-
-
200,000
1,790,161
11,583,851
Upgrading Harbour - S.Feydhoo
New S. Feydhoo
-
-
5,700,000
10,776,416
10,719,162
Upgrading Harbour - TH.Thimarafushi
New Th. Thimarafushi
-
-
6,000,000
11,343,596
11,283,328
Upgrading of Jetty - R.Angolhitheem
New R. Angolhitheemu
-
-
200,000
2,000,000
500,000
Upgrding Harbour - H.Dh.Finey
New HDh. Finey
-
-
1,000,000
2,000,000
1,000,000
Finishing of POLCO Housing Flats
Tendering Hulhumale'
-
-
18,952,500
27,006,833
18,970,953
Repair of 5 Housing Units - HA.Dhihdhoo
Pre-Tendering HA. Dhidhdhoo
-
-
152,717
288,726
287,192
Const. of 1 Housing Unit - Dh.Kudahuvadhoo
Pre-Tendering Dh. Kudahuvadhoo
-
-
493,344
855,336
775,688
National Social Housing Project
New Multiple Islands
-
-
448,512,777
500,000,000
500,000,000
Repairing Sinamale Flats - Male City
Pre-Tendering Male' City
-
-
600,000
1,134,360
1,128,333
Repairing Male Hiyaa - Male City
Pre-Tendering Male' City
-
-
750,000
1,417,949
1,410,416
Developing Harbour - L.Mundoo
Pre-Tendering L. Mundoo
-
-
6,193,140
11,708,746
11,646,539
Developing Roads - N.Manadhoo
Pre-Tendering N. Magoodhoo
-
-
4,910,130
9,283,088
9,233,768
Developing Harbour - HDh.Kurinbi
Pre-Tendering HDh. Kurinbi
-
-
4,305,090
8,139,200
8,095,958
Developing Jetty - N.Fohdhoo
Pre-Tendering N. Foddhoo
-
-
2,325,180
4,395,984
4,372,628
Developing Roads - Dh.Kudahuvadhoo
Awarded Dh. Kudahuvadhoo
-
-
1,700,000
18,000,000
17,928,698
Installing Street Lights in Road Devel. Islands
Pre-Tendering Multiple Islands
-
-
1,575,000
2,544,554
2,569,068
Land Reclamation & Coastal Protection - K.Dhiffushi
Pre-Tendering K. Dhiffushi
-
-
6,383,490
9,051,466
9,537,305
Land Reclamation - F.Bileidhoo
Pre-Tendering F. Bilehdhoo
-
-
4,300,000
10,456,513
11,039,071
Land Reclamation & Devel. Beach - Th.Kinbidhoo
Pre-Tendering Th. Kinbidhoo
-
-
5,450,000
9,145,774
9,636,675
Finishing of Islamic Centre - GDh.Thinadhoo
New GDh. Thinadhoo
-
-
720,000
1,361,232
1,353,999
Const. Of Office Complex - HDh.Kulhudhuffushi
Pre-Tendering HDh. Kulhudhuffushi
-
-
200,000
751,513
5,303,153
Building 2 Parkings Buildings
New Male' City
-
-
3,000,000
2,658,655
8,387,316
Land Reclamation - Dh.Maaenboodhoo
Pre-Tendering Dh. Maaenboodhoo
-
-
500,000
8,142,852
12,057,049
Land Reclamation for Industrial Zone - GDh.Thinadhoo
Pre-Tendering GDh. Thinadhoo
-
-
5,500,000
5,671,798
5,641,664
Land Reclamation - GDh.Gahdhoo
New GDh. Gaddhoo
-
-
7,800,000
11,060,006
11,653,654
Land Reclamation - AA.Mathiveri
New AA. Mathiveri
-
-
1,994,912
5,000,000
1,781,685
Road Construction - HA.Kelaa
Pre-Tendering HA. Kelaa
-
-
215,067
68,615
72,936
Est.Causeway - M.Muli/M.Naalaafushi
Pre-Tendering M. Naalaafushi
-
-
1,095,000
2,070,206
2,059,208
Est. Causeway-Th.Veymandhoo/Th.Kinbidhoo
Pre-Tendering Th. Veymandoo
-
-
1,095,000
2,070,206
2,059,208
Road Construction - R. Alifushi
Pre-Tendering R. Alifushi
-
-
200,000
3,653,258
8,546,910
Road Construction (Phase2 ) - L. Fonadhoo
Awarded L. Fonadhoo
-
-
8,099,690
7,444,235
19,150,840
Road Construction - GA. Kolamaafushi
Pre-Tendering GA. Kolamaafushi
-
-
68,298
129,124
128,439
Road Const.Airport to Habor-Faresmathoda
Pre-Tendering GDh. Faresmaathodaa
-
-
300,000
567,180
564,166
Development of Causeway - GDh.Faresmaathodaa
Awarded GDh. Faresmaathodaa
-
-
2,957,371
2,795,602
6,953,762
Road Construction - Adh. Mahibadhoo
Pre-Tendering ADh. Mahibadhoo
-
-
6,000,000
7,798,722
13,048,744
Developing Roads - HA.Hoarafushi
Awarded HA. Hoarafushi
-
-
10,786,187
10,196,179
10,743,460
Developing Roads - HA.Filladhoo
Pre-Tendering HA. Filladhoo
-
-
8,250,000
15,597,444
8,217,320
Developing Roads - HDh.Nolhivaranfaru
Pre-Tendering HDh. Nolhivaranfaru
-
-
300,000
567,180
564,166
Developing Roads - N.Holhudhoo
Pre-Tendering N. Holhudhoo
-
-
300,000
567,180
564,166
Developing Roads - N.Velidhoo
Pre-Tendering N. Velidhoo
-
-
14,250,000
13,470,520
14,193,552
Developing Roads - N.Manadhoo
Pre-Tendering N. Manadhoo
-
-
200,000
300,000
823,717
Estab. Causeway - B.Goidhoo & Fehendhoo
Pre-Tendering B. Goidhoo
-
-
200,000
348,934
3,000,268
Developing Roads - Lh.Naifaru
Pre-Tendering Lh. Naifaru
-
-
300,000
429,675
439,466
Developing Roads - M.Kolhufushi
Pre-Tendering M. Kolhufushi
-
-
200,000
300,000
823,717
Developing Roads - GDh.Vaadhoo
Pre-Tendering GDh. Vaadhoo
-
-
200,000
300,000
823,717
Dev. Roads Ph 2 - GA.Villingili
Pre-Tendering GA. Villingili
-
-
675,000
717,837
1,547,427
Road Construction - HA.Dhihdhoo
Pre-Tendering HA. Dhidhdhoo
-
-
14,250,000
13,470,520
14,193,552
Road Construction - GA.Gemanafushi
Pre-Tendering GA. Gemanafushi
-
-
200,000
300,000
823,717
Developing Roads - AA.Ukulhas
New AA. Ukulhas
-
-
729,000
1,378,247
1,370,924
Developing Roads - HA.Ihavandhoo
New HA. Ihavandhoo
-
-
10,500,000
9,925,646
10,458,407
Upgrading Sewerage System - K.Guraidhoo
Pre-Tendering K. Guraidhoo
-
-
1,141,566
2,158,244
2,146,777
Upgrading Sewerage System at New Settlement- L.Gan
New L. Gan
-
-
3,450,000
6,522,568
6,487,914
Estab. Visiters Centre & Public Toilets - S.Hulhudhoo
Pre-Tendering S. Hulhudhoo
-
-
360,000
680,616
677,000
Estab. Of Cultural Centre - R.Rasgetheemu
Pre-Tendering R. Rasgetheemu
-
-
200,000
424,156
3,711,428
Devel. Swimming Area - Sh.Komandoo
Pre-Tendering Sh. Komandoo
-
-
315,000
554,287
554,965
Devel. Swimming Area - Gdh.Thinadhoo
New GDh. Thinadhoo
-
-
450,000
850,770
846,249
Devel. Swimming Area - Sh.Feevah
New Sh. Feevah
-
-
450,000
850,770
846,249
Devel. Swimming Area - Sh.Feydhoo
New Sh. Feydhoo
-
-
450,000
850,770
846,249
Build. Of Cricket Stadium - Hulhumale
Pre-Tendering Hulhumale'
-
-
8,167,080
12,762,284
9,284,466
Ease of access to Habour - V.Fulidhoo
New V. Fulidhoo
-
-
525,000
992,565
987,291
Intergrated National Public Ferry Network (Phase 2 & 3)
New Male' City
-
-
536,286
911,845
1,059,342
Upgr. Of Ice Plant Jetty - F.Feeali
New F. Feeali
-
-
562,500
1,063,462
1,057,812
Estab. Water & Sewerage System - N.Magoodhoo
Tendering N. Magoodhoo
-
-
4,396,290
3,116,859
16,454,129
Estab. Water & Sewerage System - B.Kihaadhoo
Pre-Tendering B. Kihaadhoo
-
-
4,687,698
3,323,459
19,355,931
Estab. Water & Sewerage System - B.Kudarikilu
Pre-Tendering B. Kudarikilu
-
-
4,421,968
3,135,063
18,258,708
Estab. Water & Sewerage System - B.Fulhadhoo
Pre-Tendering B. Fulhadhoo
-
-
3,799,038
2,693,422
15,686,573
Estab. Water & Sewerage System - B.Fehendhoo
Pre-Tendering B. Fehendhoo
-
-
4,051,323
2,872,286
16,728,282
Estab. Water & Sewerage System - B.Dhonfanu
Pre-Tendering B. Dhonfanu
-
-
4,259,399
3,019,806
17,587,446
Estab. Electricity, Water & Sewerage System - GDh.Thinadhoo
Pre-Tendering GDh. Thinadhoo
-
-
6,200,000
4,395,643
9,263,161
Water and Sewerage System at New Settlement - S.Hithadhoo
New S. Hithadhoo
-
-
3,000,000
8,507,697
9,209,525
Water and Sewerage System at Tourism Development Zone
New Addu City
-
-
3,000,000
8,507,697
9,209,525
Estab. Water System - N.Miladhoo
Tendering N. Miladhoo
-
-
6,203,372
9,857,762
10,999,415
Estab. Water System - N.Landhoo
Tendering N. Landhoo
-
-
6,280,100
9,979,690
11,135,464
Estab. Water System - K.Thulusdhoo
Pre-Tendering K. Thulusdhoo
-
-
9,012,401
8,519,419
8,976,700
Upgrading Water System - Addu City
Pre-Tendering Addu City
-
-
1,800,000
3,403,079
3,384,998
Coastal Protection - R.Kinolhas
New R. Kinolhas
-
-
2,366,640
4,474,368
4,450,596
Coastal Protection - V.Keyodhoo
New V. Keyodhoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - SH.Komandoo
New Sh. Komandoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - R.Innamaadhoo
New R. Innamaadhoo
-
-
2,584,504
4,886,261
4,860,301
Coastal Protection - TH.Madifushi
New Th. Madifushi
-
-
2,584,504
4,886,261
4,860,301
Development Of Slipway - G.dh.Hoadedhoo
New GDh. Hoandeddhoo
-
-
200,000
787,500
2,115,537
Const. of Entrance Channel - N.Kudafari
New N. Kudafari
-
-
1,000,000
3,500,000
350,000
Const. of Entrance Channel - R.Inguraidhoo
New R. Inguraidhoo
-
-
2,250,000
4,253,848
4,231,248
Upgrding Harbour - H.DH.Neykurendhoo
New HDh. Neykurendhoo
-
-
4,002,631
22,173,584
981,119
Upgrding Harbour - Aa.Feridhoo
New AA. Feridhoo
-
-
3,002,631
22,173,584
981,119
Upgrding Harbour - Sh.Milandhoo
New Sh. Milandhoo
-
-
200,000
1,790,161
11,583,851
Ease of Access to Quay Wall - ADH.Dhangethi
New ADh. Dhangethi
-
-
500,000
2,000,000
2,000,000
Repairing Harbour - K.Gaafaru
New K. Gaafaru
-
-
1,000,000
11,445,690
11,384,881
Upgrding Harbour - Dh.Kudahuvadhoo
New Dh. Kudahuvadhoo
-
-
1,182,418
1,773,541
250,000
Const. Of Office Complex - L.Fonadhoo
New L. Fonadhoo
-
-
200,000
751,513
5,303,153
Land Reclamation - HA.Dhidhdhoo
New HA. Dhidhdhoo
-
-
1,994,912
5,000,000
1,781,685
Total
In Billion Rufiyaa
Breakdown for year: 2022